HOW DO WE PREPARE THE HOUSE FOR REMODELING AND HOW DOES THE CONTRACTOR PREPARE FOR THE WORK?

All client content needs to be removed by the client prior to the project start date from the work area. We also advise that artwork or wall hangings be taken down by the client in adjoining rooms. Construction often causes vibrations that travel through the walls and it’s important that your valuable artwork be stored in a secure location away from the construction area. We will prepare your home for construction by laying down tarps to protect the flooring and walkways as well as put filters/coverings over vents and installing plastic to section off the work zone. Any furniture left in a work area will be covered with tarps and/or plastics.

X